Listen Live
HomeClosuresNovember 7th 2022 Road Report

November 7th 2022 Road Report

ROAD ISSUES

  • Algonquin Blvd from Theriault/Cameron to Mountjoy is closed for road reconstruction until Fall
  • Wende Avenue from Rea Street South to Dalton Road is closed for road work
  • Gatineau Boulevard from Timcor Crescent to Timcor Crescent is closed for water system repairs
  • Meadow Lane from end of road to Bonaventure Drive is closed for sewer/storm repair
    • Access up to House 30 is from Bonaventure Drive only. The remainder of the block must be accessed via Shirley St S near the dead end – a by pass road has been opened.
  • Cedar Street South from Kirby Avenue to Kimberly Avenue is closed for road construction
  • Victoria Avenue from Denise Street to College Street is closed for road construction
  • Maple Street North at 5Th Avenue, to Algonquin Boulevard East, to 3Rd Avenue is closed for road repair
  • Elm Street South at 3Rd Avenue, to Algonquin Boulevard East, to 5Th Avenue is closed for road repair
  • Cedar Street South from Sterling Avenue East to Birch Street South is closed for road repair
  • Brousseau Avenue from Hemlock Street to Murray Street is closed for sewer/storm repair
  • Algonquin Boulevard East from Birch Street South to Balsam Street South is closed for road repair
  • Bristol Road at Sutherland Street is closed long term for road construction
  • Feldman Road from 168m Southwest of Mattagami Boulevard South to 115m Southwest of Mattagami Boulevard South is closed for road construction
  • Bartleman Street from Westmount Boulevard to Hamelin Avenue is closed for construction
  • Lee Avenue from Balsam Street South to Cedar Street South is closed for road maintenance
  • James Avenue from 28m West of Brunette Road to 6Th Avenue is closed for construction until 9pm on November 3rd
  • 6Th Avenue at Tamarack Street, to Spruce Street North, to 7Th Avenue, to Tamarack Street is closed due to a water main break
  • Columbus Avenue from Preston Street to Rea Street South is closed for a water main break and expected to open at 5pm November 4th
  • Balsam Street North from 5Th Avenue to 6Th Avenue is closed for construction
  • Wilson Avenue from Mattagami Boulevard South to Fogg Street South is closed for utility work until approximately 5pm on November 8th
  • Algonquin Boulevard East at Balsam Street South, to Pine Street North, to Cedar Street South, to 5Th Avenue, to Algonquin Boulevard East, to 3Rd Avenue, to Algonquin Boulevard East, to Balsam Street South is closed for water system repair until 11:30am on Sunday November 6th

If you see a collision, a road closure, have an update, or anything else, please call or text Country 93.1 at 705-264-9310

- Advertisment -
- Advertisment -
- Advertisement -

Continue Reading