No collisions to report, however:
- Balsam is closed between Seventh and Eighth
- Rea between Polaris and Quartz is currently closed
- Pine Street is CLOSED between Algonquin Blvd and Third Ave for road repairs
- Birch Street is CLOSED between Lee Ave and Sterling Ave
- Traffic has been reduced to 1-lane in each direction on the Rae Hill-area of Highway 101 for roadwork, which could cause delays, due to congestion. The road work is expected to last until mid-August
If you see a collision, a closed road, have an update, or anything else, please call 93.1 Moose FM at:
705-264-9310